Monday, 18 March 2013

Production Log/meetings


25/02/2013
During our media lesson we picked our production group for our advertising unit. I chose to work with Shamim and Shoaib.
28/02/2013
On this date, we all produced our individual idea for the advert we are going to produce.
04/03/2013
We looked at each of our individual ideas and decided to choose Shoaib’s idea of advertising a body wash.
07/03/2013
We all produced our own mood boards.
11/03/2013
I wrote the treatment for our group. We produced a questionnaire as a group and gave them out to 12 people. We gave them to 8 boys and 4 girls. Shoaib then collated the results from the questionnaires into a report and produced graphs.
14/03/2013
We sat together and chose the location we wanted to use to film our advert. We got Shamim to sign the location agreement from. We also produced the storyboard as a group. Shamim produced the risk assessment for the possible hazards that could occur. We then held auditions as to who would take on the lead role.  We auditioned three men. We then chose our top three. After a long group discussion we decided that Shamim should take on the lead role. I produced a document on casting choices. We then got Shamim to sign the casting agreement form.
17/03/2013
I produced the synopsis for our group.
20/03/2013
We as a group went out in our free time to film our advert. We filmed our whole advert in three hours. Shamim acted in the advert, while I and Shoaib filmed the advert.  We also recorded our voiceover.
21/03/2013
I created the budget for our advert. Looking at the costs for the location and camera. Shoaib created the shooting schedule and shot record sheet
25/03/2013
Shamim created a document that explained the reasons for choosing our location. 
15/04/2013
Shamim create a document that included the mise-en-scene for our location and props list.
18/04/2013
Shoaib produced a breakdown sheet.
22/04/2013
Shamim created camera diagrams that highlighted the camera set up.
29/04/2013
We continued to edit our advert.
09/05/2013
We produced draft one. We looked at what we needed to improve.
13/05/2013
We as a group filmed outside Sidney Stringer Academy. We used the pathway that leads to the schools reception. We used our lead actor and extras in the scenes we filmed at that location.
16/05/2013
Our advert was completed by this date.

No comments:

Post a Comment