25/02/2013
|
During our media lesson
we picked our production group for our advertising unit. I chose to work with
Shamim and Shoaib.
|
28/02/2013
|
On this date, we all
produced our individual idea for the advert we are going to produce.
|
04/03/2013
|
We looked at each of
our individual ideas and decided to choose Shoaib’s idea of advertising a
body wash.
|
07/03/2013
|
We all produced our own
mood boards.
|
11/03/2013
|
I wrote the treatment
for our group. We produced a questionnaire as a group and gave them out to 12
people. We gave them to 8 boys and 4 girls. Shoaib then collated the results
from the questionnaires into a report and produced graphs.
|
14/03/2013
|
We sat together and
chose the location we wanted to use to film our advert. We got Shamim to sign
the location agreement from. We also produced the storyboard as a group.
Shamim produced the risk assessment for the possible hazards that could
occur. We then held auditions as to who would take on the lead role. We auditioned three men. We then chose our
top three. After a long group discussion we decided that Shamim should take
on the lead role. I produced a document on casting choices. We then got
Shamim to sign the casting agreement form.
|
17/03/2013
|
I produced the synopsis
for our group.
|
20/03/2013
|
We as a group went out
in our free time to film our advert. We filmed our whole advert in three
hours. Shamim acted in the advert, while I and Shoaib filmed the advert. We also recorded our voiceover.
|
21/03/2013
|
I created the budget
for our advert. Looking at the costs for the location and camera. Shoaib
created the shooting schedule and shot record sheet
|
25/03/2013
|
Shamim created a
document that explained the reasons for choosing our location.
|
15/04/2013
|
Shamim create a
document that included the mise-en-scene for our location and props list.
|
18/04/2013
|
Shoaib produced a
breakdown sheet.
|
22/04/2013
|
Shamim created camera
diagrams that highlighted the camera set up.
|
29/04/2013
|
We continued to edit
our advert.
|
09/05/2013
|
We produced draft one.
We looked at what we needed to improve.
|
13/05/2013
|
We as a group filmed
outside Sidney Stringer Academy. We used the pathway that leads to the
schools reception. We used our lead actor and extras in the scenes we filmed
at that location.
|
16/05/2013
|
Our advert was completed
by this date.
|
Monday, 18 March 2013
Production Log/meetings
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment