Thursday, 21 March 2013

LO3: Budget


Location Fees payable to the Location owner
Below is a fee guideline showing what your property might earn should it be selected to work on a film, tv or photoshoot production:
Feature Film Productions
From £750 - £5,000+ per 12 hour day
Television Dramas
From £500 - £3,000+ per 12 hour day
Documentary filming
From £400 - £1000+ per 12 hour day
Photoshoots
From £500 - £1500+ per 10 hour day
Television Commercials
From £1000 - £3000+ per 12 hour day
Music Videos
From £500 - £3000+ per 12 hour day

We need the location for three hours; therefore, the location fee would be £500.

Camera Hire

Ideally, we would have liked to use the sony pmw 200






Sony PMW 200 Hire and Rental - £310.00 per day

In the Sony PMW200s arsenal is a world wide compatibility that can film in 24, 25, 30, 50, and 60 fps in both progressive and interlaced giving you a world wide audience for anything you shoot also benefitting and making great use of a smaller sensor allowing you easily keep just about everything in focus superb for live situations when you really have no idea who or what you will need to home in on next and armed with a Fujinon three ring14x zoom lens controlling zoom, iris, and of course focus you really do have a very flexible piece of kit that can and will handle anything that gets your attention and you wish to capture even when you are dealing with the fastest change of subject or situation the PMW200 will keep up if not be a step ahead of you with a generous 15 second buffer even if the unexpected happens you will have captured the previous 15 seconds of footage before you hit the record button.

however, we ended up using a Nikon D90

Daily Hire
£49.17 (£59.00)
Weekend Hire
£75.00 (£90.00)
Weekly Hire
£147.50 (£177.00)
2 Weekly Hire
£198.33 (£238.00)
3 Weekly Hire
£246.67 (£296.00)
Deposit
£163.00


our camera cost would be £59









·         Cost of model 
 

Wednesday, 20 March 2013

LO3: Still photos on shoot

Me and Shoiab
Me holding the flash light

Shamim
Shoiab

LO3: Script/voiceover


Head, shoulders, knees and toes an all-in-one body wash and shampoo. It contains a popular scent of Hugo boss bottled. It has an all-in-one formula containing hydro-zinc that will leave your hair flake free. 

Head, shoulders, knees and toes…stay FRESH

Monday, 18 March 2013

Production Log/meetings


25/02/2013
During our media lesson we picked our production group for our advertising unit. I chose to work with Shamim and Shoaib.
28/02/2013
On this date, we all produced our individual idea for the advert we are going to produce.
04/03/2013
We looked at each of our individual ideas and decided to choose Shoaib’s idea of advertising a body wash.
07/03/2013
We all produced our own mood boards.
11/03/2013
I wrote the treatment for our group. We produced a questionnaire as a group and gave them out to 12 people. We gave them to 8 boys and 4 girls. Shoaib then collated the results from the questionnaires into a report and produced graphs.
14/03/2013
We sat together and chose the location we wanted to use to film our advert. We got Shamim to sign the location agreement from. We also produced the storyboard as a group. Shamim produced the risk assessment for the possible hazards that could occur. We then held auditions as to who would take on the lead role.  We auditioned three men. We then chose our top three. After a long group discussion we decided that Shamim should take on the lead role. I produced a document on casting choices. We then got Shamim to sign the casting agreement form.
17/03/2013
I produced the synopsis for our group.
20/03/2013
We as a group went out in our free time to film our advert. We filmed our whole advert in three hours. Shamim acted in the advert, while I and Shoaib filmed the advert.  We also recorded our voiceover.
21/03/2013
I created the budget for our advert. Looking at the costs for the location and camera. Shoaib created the shooting schedule and shot record sheet
25/03/2013
Shamim created a document that explained the reasons for choosing our location. 
15/04/2013
Shamim create a document that included the mise-en-scene for our location and props list.
18/04/2013
Shoaib produced a breakdown sheet.
22/04/2013
Shamim created camera diagrams that highlighted the camera set up.
29/04/2013
We continued to edit our advert.
09/05/2013
We produced draft one. We looked at what we needed to improve.
13/05/2013
We as a group filmed outside Sidney Stringer Academy. We used the pathway that leads to the schools reception. We used our lead actor and extras in the scenes we filmed at that location.
16/05/2013
Our advert was completed by this date.